PACKAGE 1 (Trans-Niger Pipeline Loopline)

This is a contract with the Shell Petroleum Development Company (SPDC) in which KEL is constructing a 30-inch x 12.5kilometer Loopline and Fibre Optic Cable from Ogale Manifold to TPI in Rivers State.

TB 1921 CONTRACT FOR OML 123

This is an ongoing project for which KEL has completed the installation of subsea pipelines, fabrication and installation of decks and topsides for Addax Petroleum Development Company at Adanga field, Offshore Calabar.

LOT 3G – 24” X 107KM

LOT 3

Working for Niger Delta Power Holding Company (NDPHC), KEL successfully executed the construction and installation of the Adanga-Calabar Gas Transmission Pipeline and Metering Station.

LOT 4G – 24” X107KM

LOT 4G

The Gas Pipeline Rehabilitation (Oben-Sapele) and Metering Station upgrade/extension was carried out by KEL for NDPHC.

TB1921 Contract for OML 123

Client: Addax Petroleum Nigeria

This is an ongoing project for which KEL has completed the installation of subsea pipelines, fabrication and installation of decks and topsides for Addax Petroleum Development Company at Adanga field, Offshore Calabar.

KTMB Deck Installation (250 tonnes)

ADRP1 Tripod (95 tonnes)

TMMP Deck Extension (50 tonnes)

AD22 Deck (110 tonnes)

ADNH-6WI Deck (50 tonnes)

ADNH-7WI Deck (50 tonnes)

ADNA Deck (220 tonnes)

ADSI Topside Demolition, Installation and Hook-Up

ADRP1 Booster Compressor Deck (80 tonnes)

16" KTMB to TPU Pipeline  (13km)

6" Gas Lift ADNB to ADNH-4H Pipeline (2.1km)

16" ADRP1 to TMMP Pipeline (12km) (40m water Depth)

6" EBE to EBPP Pipeline (3.2km)

6" ADNA to ADNB Pipeline (1.6km)

8"  ADSI to AD22  Pipeline (2km)

8" AD22 to Wl6 Pipeline (2.6km)

8" AD22 to Wl7 Pipeline (4.2km)

12" ADNA to ADPP Pipeline (3.2km

 